Publishing a version

Check a draft and publish it so programs can use it.

What this page is for

Publishing turns a draft version into the finished plan that programs can use. It is a one-way step: a published version is frozen and can never be edited, unpublished or deleted. So the product shows you a check first, and asks you to type the template’s name before the Publish button works.

Where
Press Publish… at the top right of a draft in the version editor
Who can open it
Administrators. Support logins do not see the button.
App
Program Studio

How publishing works

From a finished draft to a published version
YouCraftBridgeIQPress PublishYesNo: the message says what to addPress Publish… onthe draftShows weeks,activities, timeand coverageRead the check,then type thetemplate nameHas at leastone week andone activity?Saves it asPublished andfreezes it
The same steps as a list
  1. Press Publish… on the draft
  2. Shows weeks, activities, time and coverage
  3. Read the check, then type the template name
  4. Has at least one week and one activity? (Yes: Saves it as Published and freezes it; No: the message says what to add: Read the check, then type the template name)
  5. Saves it as Published and freezes it

The screen

The Publish this version box showing weeks, activities, estimated time, competency coverage, a list of uncovered competencies and an empty confirmation field.
The publish check. The numbers match the table below.
No.ControlWhat it doesWhat happens next
1Publish this version?The title of the box.Nothing; it is a label.
2Once published, this version is frozen, content edits require creating a new version.A reminder that publishing cannot be undone.Nothing; it is a notice.
3WeeksHow many weeks you built, against the number planned when the draft was created, for example 3 of 4 planned.A difference does not stop you. It is there so you can notice it.
4ActivitiesHow many activities there are in the whole version.Nothing; it is a display.
5Estimated timeThe estimated minutes of all activities added up, shown in hours.Nothing; it is a display. Activities without minutes add nothing.
6Competency coverageHow many of your competencies at least one activity is tagged with, for example 2 of 21 tagged.Reads unavailable if the figures could not be loaded.
719 uncovered competenciesA yellow box naming the competencies that no activity teaches. Shown only when there are some.Nothing; it is a warning, not a block.
8Type “Quality Inspector Track” to confirmA box where you type the template's name exactly. Your template's name appears in the label.Publish stays greyed out until what you typed matches.
9CancelCloses the box without publishing.You are back in the editor.
10PublishPublishes the version. It reads Publishing… while it works.A confirmation appears, the box closes and the version becomes Published.

After you type the name exactly, Publish turns on:

The Publish this version box with the template name typed in the confirmation field and the Publish button now dark green.
Publish is ready once the name matches.

If a draft has no weeks or no activities, the server refuses and the box stays open with a red message at the bottom:

The Publish this version box for an empty draft with a red message saying the version has 0 weeks and 0 activities.
An empty draft cannot be published.

Step by step

Publish a draft

  1. Open the draft in the version editor.
  2. Press Publish…
  3. Read Weeks, Activities, Estimated time and Competency coverage.
  4. If you want to cover a competency that is listed as uncovered, press Cancel and tag it. Otherwise carry on.
  5. Type the template’s name in the confirmation box, exactly as it is written in the label.
  6. Press Publish.

The version is now Published and read-only. It can be chosen when you create a program. See Programs.

Stop before publishing

  1. Press Cancel, or the cross at the top right of the box.

The draft is exactly as you left it.

Change something after publishing

  1. Open the published version.
  2. Press Create new version from this.
  3. Edit the new draft, then publish it.

The confirmation field

FieldRequiredRulesExample
Type “Quality Inspector Track” to confirmYesMust match the template's name exactly, apart from spaces at the start or end. Up to 200 characters.Quality Inspector Track

Messages you can see

MessageWhen you see itWhat to do
Version publishedAfter Publish works.Nothing. The box closes and the version is read-only.
Couldn't publish this version.Publish failed and the server gave no more specific reason. A more specific server message is shown in its place when there is one.Try again.
Track template version (id) has 0 week(s) and 0 activity(ies); add at least one week with one activity before publishingThe draft has no weeks or no activities. The message starts with the version's id and shows the real counts.Press Cancel, add a week with an activity, then publish again.
Track template version (id) is 'published'; only a draft can be publishedThe version was already published, for example by a colleague a moment earlier.Nothing. Reload the page.
Couldn't load everything needed to check this version, so its counts may be wrong. Publishing is disabled until it loads.The check could not read the weeks, activities or competencies.Press Try again beside the message.
unavailableIn place of the competency coverage figure while the check could not load.Press Try again.
This account can view but not change data.A support login's publish was refused by the server.Ask your administrator.

Limits and other roles

  • A version needs at least one week and at least one activity to be published.
  • Publishing cannot be undone. A published version cannot be edited, unpublished or deleted.
  • Publish stays off while the check is still loading or could not load.
  • The box cannot be closed while it is publishing.

Common questions

Why is Publish greyed out?

Either what you typed does not match the template’s name yet, or the check is still loading or failed to load. Type the name exactly as the label shows it.

Do uncovered competencies stop me?

No. The yellow list is a warning. You can publish with competencies that no activity teaches.

The weeks say 3 of 4 planned. Is that a problem?

The product does not block it. The number planned was set when the draft was created, and the check shows how many weeks you built. If you meant to build four weeks, cancel and add the last one.

Can I unpublish a version?

No. There is no control for it, and the product refuses any edit to a published version. Create a new version from it and publish that instead.

Why is there no Publish… button?

The version is already published, or you are signed in as a support login. A published version shows Create new version from this instead.

Last checked 2026-11-03 against the product.